September 20, 2017 - Agenda
Public Works and Transportation Committee
Anderson Room, City Hall
6911 No. 3 Road
Wednesday, September 20, 2017
4:00 p.m.
Pg. # |
ITEM |
|
|
|
MINUTES |
PWT-4 |
Motion to adopt the minutes of the meeting of the Public Works and Transportation Committee held on July 19, 2017. |
||
|
|
|
|
|
|
NEXT COMMITTEE MEETING DATE |
|
|
October 18, 2017, (tentative date) at 4:00 p.m. in the Anderson Room |
|
|
PLANNING AND DEVELOPMENT DIVISION |
|
1. |
River Road – Proposed Additional Road Safety Enhancement Measures |
|||
PWT-8 |
See Page PWT-8 for full report |
||||
|
|
Designated Speaker: Victor Wei |
|||
|
|
STAFF RECOMMENDATION |
|||
|
|
(1) |
That Option 2 as described in the staff report titled “River Road – Proposed Additional Road Safety Enhancement Measures” dated August 22, 2017 from the Director, Transportation, be endorsed for implementation as part of on-going city-wide efforts to improve safety for road users; and |
||
|
|
(2) |
That Richmond RCMP be requested to establish regular speed and vehicle weight enforcement on River Road between No. 6 Road and Westminster Highway as a complementary road safety enhancement measure to Recommendation 1. |
||
|
|
|
|||
|
|
ENGINEERING AND PUBLIC WORKS DIVISION |
|
2. |
Metro Vancouver Capital Construction Update 2017 |
||
PWT-17 |
See Page PWT-17 for full report |
|||
|
|
Designated Speaker: Lloyd Bie |
||
|
|
STAFF RECOMMENDATION |
||
|
|
That the report titled “Metro Vancouver Capital Construction Update 2017,” dated August 25, 2017 from the Director, Engineering be received for information. |
||
|
|
|
||
|
3. |
Restriction of Groundwater Discharge to City Drainage and Sanitary Systems |
||
PWT-22 |
See Page PWT-22 for full report |
|||
|
|
Designated Speaker: Lloyd Bie |
||
|
|
STAFF RECOMMENDATION |
||
|
|
That the Drainage, Dyke, and Sanitary Sewer System Bylaw No. 7551, Amendment Bylaw No. 9751 be introduced and given first, second and third readings. |
||
|
|
|
||
|
4. |
Shell Road North Drainage Pump Station |
||
PWT-26 |
See Page PWT-26 for full report |
|||
|
|
Designated Speaker: Milton Chan |
||
|
|
STAFF RECOMMENDATION |
||
|
|
That the design concept for the Shell Road North Drainage Pump Station as detailed in Attachment 1 of the staff report titled “Shell Road North Drainage Pump Station” dated August 9, 2017 from the Director, Engineering be approved. |
||
|
|
|
||
|
5. |
Riparian Response Strategy Compliance Update |
||
PWT-32 |
See Page PWT-32 for full report |
|||
|
|
Designated Speaker: Chad Paulin |
||
|
|
STAFF RECOMMENDATION |
||
|
|
That the report titled “Riparian Response Strategy Compliance Update” from the Director, Engineering, dated September 11, 2017 be received for information. |
||
|
|
|
||
|
6. |
MANAGER’S REPORT |
|
|
ADJOURNMENT |
||
|
|
|
||