|
Public Works & Transportation Committee
Anderson Room, City Hall 6911 No. 3 Road
Wednesday, September 22nd, 2004 4:00 p.m.
|
|
POLICIES / STRATEGIES (0 ITEMS) |
*********************************** |
|
|
DECISIONS / ACTIONS (2 ITEMS) |
|
|
URBAN DEVELOPMENT DIVISION |
10 |
2. |
TRANSLINK 2005 CAPITAL PROGRAM COST-SHARING SUBMISSIONS - MAJOR ROAD NETWORK, BICYCLE INFRASTRUCTURE PROGRAM AND TRANSIT-RELATED ROAD INFRASTRUCTURE PROGRAM (Report: Sept. 9/04, File No.: 10-6500-01/2004-Vol 01) (REDMS No. 1331794) |
|
|
Designated Speaker: Victor Wei |
|
|
STAFF RECOMMENDATION |
|
|
(1) |
That the submission of the following four improvement projects for cost-sharing as part of the TransLink 2005 Major Road Network Minor Capital Program, (as described in the report dated September 9th, 2004, from the Acting Director, Transportation), be endorsed: |
|
|
|
(a) |
No. 3 Road / Browngate Road Traffic Signal Modification; |
|
|
|
(b) |
Installation of Central Traffic Signal Control System; |
|
|
|
(c) |
Gilbert Road Widening (north of Elmbridge Way) and Gilbert Road / Lansdowne Road Traffic Signal Installation; and |
|
|
|
(d) |
Westminster Highway / No. 4 Road Left-Turn Lane Improvement. |
|
|
(2) |
That the submission to extend the Shell Road bicycle route from Athabasca Drive to Horseshoe Slough Trail for cost-sharing as part of the TransLink 2005 Bicycle Infrastructure Capital Cost-Sharing Program (Year 3 of a 3-year accrued funding application), (as described in the report dated September 9th, 2004, from the Acting Director, Transportation), be endorsed. |
|
|
(3) |
That the submission of various transit facility improvements for cost-sharing as part of the TransLink 2005 Transit-Related Road Infrastructure Program, (as described in the report dated September 9th, 2004, from the Acting Director, Transportation), be endorsed. |
|
|
|
PARKS, RECREATION & CULTURAL SERVICES DIVISION |
*********************************** |
|
|
INFORMATION / AWARENESS (0 ITEMS) |
|
4. |
MANAGER’S REPORT |
|
|